Search found 4 matches
- Sun Aug 08, 2004 9:43 am
- Forum: Vensim
- Topic: running batch jobs
- Replies: 2
- Views: 5091
running batch jobs
I am running a model and there is a variable wich I need to change for different runs. It takes a lot of time changing this variable, running the model and repeating the operation for a new value. Has any one tried to automate this type of operation using Vensim PLE Pus? Please any hints very much a...
- Mon Mar 29, 2004 2:56 pm
- Forum: System Dynamics Discussion
- Topic: Hydro Thermal Electricity Scheduling
- Replies: 1
- Views: 5141
Hydro Thermal Electricity Scheduling
I am considering to use the vensim optimization tool for hydrothermal scheduling. Has anyone experience with that or performed scheduling with Vensim at all?
- Thu Mar 18, 2004 6:42 pm
- Forum: Vensim
- Topic: Averaging a set of values
- Replies: 2
- Views: 3774
Averaging a set of values
I am running a model using month as the time step and would like to calculate the yearly averages. Please How can I implement a monthly counter? Or there is a simpler way to do that? (Vensim Ple Plus)
- Mon Jul 07, 2003 8:50 am
- Forum: Vensim
- Topic: Reading column from excel
- Replies: 2
- Views: 8032
Reading column from excel
I have Vensim PLE Plus.
I would like to be able to read a column from excel to use the values in a model variable.
For instance: Workbook Demand, Sheet yearly, 12 values in column C, i.e. the monthly values for electricity demand for a specific load.
Thanks for any suggestions.
I would like to be able to read a column from excel to use the values in a model variable.
For instance: Workbook Demand, Sheet yearly, 12 values in column C, i.e. the monthly values for electricity demand for a specific load.
Thanks for any suggestions.