Sable time step v's reporting time

Use this forum to post Sable related questions.

Moderator: Administrator

Post Reply
ajclarke
Junior Member
Posts: 13
Joined: Thu Apr 08, 2010 7:37 am

Sable time step v's reporting time

Post by ajclarke »

I have a Vensim model with a time step of 5 minutes but I only want Sable to report on it ( calculate? ) at hourly intervals otherwise it runs too slowly.

How do I tell Sable to draw graphs or do animations at an interval greater than a time step?
Administrator
Super Administrator
Posts: 4573
Joined: Wed Mar 05, 2003 3:10 am

Post by Administrator »

Are you running a game?
ajclarke
Junior Member
Posts: 13
Joined: Thu Apr 08, 2010 7:37 am

Post by ajclarke »

Not running a Game, just using Sable to link into the model that I published.
Administrator
Super Administrator
Posts: 4573
Joined: Wed Mar 05, 2003 3:10 am

Post by Administrator »

Then the answer is you cannot do anything about it. I'll add it to the list for a future update though.
Lee Jones

Post by Lee Jones »

Try changing the save period in Vensim (SAVEPER)

Go to menu>Model>settings and the "Time Bounds" tab

De-select "save results every time step" and choose a new interval at which to save results.

The model will still calculate at the "5 minute" time step but report results at the newly selected period, both in Vensim and Sable
Post Reply