How to model 2 stocks feeding a 3rd one through a single valve?
Posted: Mon Aug 08, 2016 10:53 pm
Dear Messrs.
good evening and best wishes.
I am trying to build a model following the logic embedded on paper System dynamics applied to project management: a survey, assessment, and directions for future research by Lyneis and Ford. In their paper, they suggest that two stocks (Original Work to Do and Rework to Do) are feeding a third one (Work Done) using a single rate named Progress (please see the enclosed document). I would appreciate it if someone could help me by telling how to create this structure using Vensim PLE (I mean manipulating the software to connect the first two stocks to the third one, using this very single valve/rate).
Kind regards,
Bruno.
bffcosta@yahoo.com.br
good evening and best wishes.
I am trying to build a model following the logic embedded on paper System dynamics applied to project management: a survey, assessment, and directions for future research by Lyneis and Ford. In their paper, they suggest that two stocks (Original Work to Do and Rework to Do) are feeding a third one (Work Done) using a single rate named Progress (please see the enclosed document). I would appreciate it if someone could help me by telling how to create this structure using Vensim PLE (I mean manipulating the software to connect the first two stocks to the third one, using this very single valve/rate).
Kind regards,
Bruno.
bffcosta@yahoo.com.br