Need Help with simulation

Use this forum to post Vensim related questions.
Post Reply
tureta
Junior Member
Posts: 2
Joined: Mon Feb 20, 2017 11:01 pm
Vensim version: PLE

Need Help with simulation

Post by tureta »

In my simulation ocoour from the period 0 to 160 hour and, i'm using a time step of 1/64. Therefore, i can't copy all my datas from the simulation, becouse my Vensim only support 8000 dates per simulation.

My ideia for solve this problem is make 2 simulation, one from 0h to 80h (half of simulation) and 80h to 160h (another half) and take both datas. Whoever, when i take the simulation of 80h to 160h, is the same as the simulation of 0h to 80h with a displacement time.

What i wanted is how i simulate the period of 80h to 160h starting with the data by the half of simulation.

Appreciate a lot if someone could help me, this is for my university work.
Administrator
Super Administrator
Posts: 4573
Joined: Wed Mar 05, 2003 3:10 am

Re: Need Help with simulation

Post by Administrator »

You don't need to run two simulations. Run a single simulation, then use the Vensim control panel to show different periods of time (0-80 hours and 80-160).
Advice to posters seeking help (it really helps us to help you)
http://www.ventanasystems.co.uk/forum/v ... f=2&t=4391

Units are important!
http://www.bbc.co.uk/news/magazine-27509559
tomfid
Administrator
Posts: 3806
Joined: Wed May 24, 2006 4:54 am

Re: Need Help with simulation

Post by tomfid »

What are you simulating that requires such a short time step?

Another option would be to set SAVEPER > 1/64, if you don't need every time step of output.

Or, use data export instead of the table tool to move your data (that's often better anyway, because you can run the export automatically after each simulation).