Final Time and graph time

Use this forum to post Vensim related questions.
Post Reply
pdrezelo
Junior Member
Posts: 6
Joined: Sun Sep 12, 2010 10:43 am

Final Time and graph time

Post by pdrezelo »

Hi
I have a Vensim that is set for a Final Time of 60 months in Time Bounds, however, when I create a graph for it in Control Panel, the graph has a timeline of 100 months on the x axis.

Does anyone know of a way I can get the graph to display the same timeframe as what the model is set for?

Paul
Administrator
Super Administrator
Posts: 4841
Joined: Wed Mar 05, 2003 3:10 am

Post by Administrator »

Do you have more than one run loaded?
pdrezelo
Junior Member
Posts: 6
Joined: Sun Sep 12, 2010 10:43 am

graphs

Post by pdrezelo »

Actually, I realized I had set the time axis to 100 in custom graphs, which was the reason.
Post Reply