Time Step
Posted: Tue Mar 30, 2004 6:01 pm
The attached model has a very simple Level-Rate-Level structure.
We start with 1m cranberies. The Daily Cranbery Collection rate is based on the level (in fact it is equal to the level - therefore expecting everything to be collected in one day). The last level is the number of collected cranberies.
Everything works OK until you change the Time Step. If you change it to 0.5 then 500k are collected at time 0.5 (as expected) but only an extra 250k at time 1 rather than the 500k. Why?