how to run different Time Step in one model
-
- Newbie
- Posts: 1
- Joined: Sat Jun 26, 2004 4:18 pm
how to run different Time Step in one model
I want to re-run part of the model which include subscript to let the subscript can be checked more than each week. Attaching the model, i want to run 'Interface constraints met' at least triplep per week, but the others must run only once per week. How can i do it? and also, i can't figure out how to make 'time step' as a variable instead of using as a Shadow varialbe. I followed the Help to find the Text editor, but that seems doesn't work. It's urgently, since i need it to finish the research, thanks in advance.
- Attachments
-
- Model040623.mdl
- (14.83 KiB) Downloaded 413 times
How to run different time step
Why don't you use the time step needed for your inside week constraints for all the model. It is easier to adapt the model to a smaller time step than to work with different parallel time steps.
J.J. Laublé