Delay Conveyors with Leakage
Posted: Fri Aug 06, 2004 2:53 pm
I am using a lot of delay conveyors in my model and am basing them on the simple example supplied with Vensim help, particularly Convey3.mdl.
The leakage equation in that model shows leakage = (conveyor contents + (inflows - outflows)*TIME STEP)*decay rate.
My problem is that I want my conveyor to have two different leaks, each of which is controled by different factors. In order to do this, I tried counting Leak 2 as an outflow in the leakage equation for Leak 1 and visa versa. Not surprisingly (on subsequent thought!), this returned an error since neither leakage can be calculated until the other one has been.
Is there a way of having two independant leaks from a single delay conveyor?
My delay conveyor has 2 inflows, a delayed outflow and 2 leakage outflows.
The leakage equation in that model shows leakage = (conveyor contents + (inflows - outflows)*TIME STEP)*decay rate.
My problem is that I want my conveyor to have two different leaks, each of which is controled by different factors. In order to do this, I tried counting Leak 2 as an outflow in the leakage equation for Leak 1 and visa versa. Not surprisingly (on subsequent thought!), this returned an error since neither leakage can be calculated until the other one has been.
Is there a way of having two independant leaks from a single delay conveyor?
My delay conveyor has 2 inflows, a delayed outflow and 2 leakage outflows.