Delay
Posted: Wed Dec 08, 2004 8:51 pm
Hi,
I'm very new at this. The question that I have is how can I model a process that have a delay, but this delay is given by a change in a variable that is not time or size directly?
What I need is to delay a process the time used for example by control variable to change it’s value.
[Edited on 12-9-2004 by rolando]
I'm very new at this. The question that I have is how can I model a process that have a delay, but this delay is given by a change in a variable that is not time or size directly?
What I need is to delay a process the time used for example by control variable to change it’s value.
[Edited on 12-9-2004 by rolando]