Hi
I have a Vensim that is set for a Final Time of 60 months in Time Bounds, however, when I create a graph for it in Control Panel, the graph has a timeline of 100 months on the x axis.
Does anyone know of a way I can get the graph to display the same timeframe as what the model is set for?
Paul
Final Time and graph time
-
- Super Administrator
- Posts: 4841
- Joined: Wed Mar 05, 2003 3:10 am