Final Time and graph time

Posted: Sat Sep 25, 2010 12:47 pm
by pdrezelo
Hi
I have a Vensim that is set for a Final Time of 60 months in Time Bounds, however, when I create a graph for it in Control Panel, the graph has a timeline of 100 months on the x axis.

Does anyone know of a way I can get the graph to display the same timeframe as what the model is set for?

Paul

Posted: Sat Sep 25, 2010 2:11 pm
by Administrator
Do you have more than one run loaded?

graphs

Posted: Sat Sep 25, 2010 7:08 pm
by pdrezelo
Actually, I realized I had set the time axis to 100 in custom graphs, which was the reason.