Batch Delay
Posted: Tue Nov 25, 2003 4:14 pm
I have a batch delay that releases requirements once the stock accumulating it reaches a value of 1 (100 % complete). The batch delay is the approval rate that drains the stock. Why is the release triggered early, so that 1 flows out of the stock, even though the stock has not reached a value of 1 yet, so it goes negative? The batch size is 1, with no initial backlog.
Since my model is arrayed by requirement, this problem gets progressively worse with each element. By the sixth element, the flow is triggered when the stock is only at a value of 0.65
Since my model is arrayed by requirement, this problem gets progressively worse with each element. By the sixth element, the flow is triggered when the stock is only at a value of 0.65