Need Help with simulation
Posted: Thu Mar 29, 2018 11:16 am
In my simulation ocoour from the period 0 to 160 hour and, i'm using a time step of 1/64. Therefore, i can't copy all my datas from the simulation, becouse my Vensim only support 8000 dates per simulation.
My ideia for solve this problem is make 2 simulation, one from 0h to 80h (half of simulation) and 80h to 160h (another half) and take both datas. Whoever, when i take the simulation of 80h to 160h, is the same as the simulation of 0h to 80h with a displacement time.
What i wanted is how i simulate the period of 80h to 160h starting with the data by the half of simulation.
Appreciate a lot if someone could help me, this is for my university work.
My ideia for solve this problem is make 2 simulation, one from 0h to 80h (half of simulation) and 80h to 160h (another half) and take both datas. Whoever, when i take the simulation of 80h to 160h, is the same as the simulation of 0h to 80h with a displacement time.
What i wanted is how i simulate the period of 80h to 160h starting with the data by the half of simulation.
Appreciate a lot if someone could help me, this is for my university work.