Star (*) sign in optimization result
Posted: Tue Oct 02, 2018 10:52 pm
Hi Tom,
Sometimes the optimization result comes with a star (*) ahead of a parameter being optimized. Something like the following:
Maximum payoff found at:
*Inventory of products = 5e+007
What does the star (*) mean? I remember there are some old posts in which people asked the same question, however I have tried to search those posts but failed to locate them. Vensim Help seems to not explain it, despite that the examples of optimization show star signs, too. (Maybe there is some explanation but I could not find it).
Many thanks for your time.
Sometimes the optimization result comes with a star (*) ahead of a parameter being optimized. Something like the following:
Maximum payoff found at:
*Inventory of products = 5e+007
What does the star (*) mean? I remember there are some old posts in which people asked the same question, however I have tried to search those posts but failed to locate them. Vensim Help seems to not explain it, despite that the examples of optimization show star signs, too. (Maybe there is some explanation but I could not find it).
Many thanks for your time.