Page 1 of 1

Help - please

Posted: Fri Sep 20, 2019 2:21 pm
by wanderbeg
Hi people
Someone could help me out here!

Here's how, I have historical reservoir level data from 2005 to 2017, but I want to do simulations by 2020. I put this time (2005-2020) in the model settings in vensim.
What happens is that the line does not touch the "0" point of the x axis.
I know the reservoir level will not reach water until 2010, but I was wondering how long it will have water.

Note: I'm new to Vensim.

Thanks

Re: Help - please

Posted: Fri Sep 20, 2019 2:48 pm
by Administrator
You'll need to upload the model, there is nothing we can do with only a graph to look at.

Re: Help - please

Posted: Fri Sep 20, 2019 3:28 pm
by tomfid
Is this a data variable? If so, the line won't extend past the end of the data.