Posted: Wed Oct 04, 2023 12:05 pm
by nidfar
Hi,
can i make a time based variabel for subscript? i wanna try critical path method for project in vensim.
for example, i have 3 scope for my project: design, engineering, and installation.
the duration:
design 30 weeks, engineering 15 weeks, installation 35 weeks.
i wanna put these variabel into subscript feature, can vensim afford it?

any adviced are welcome, thank you.

Re: Subscript for time based variabel

Posted: Wed Oct 04, 2023 12:10 pm
by Administrator
You need Vensim Pro or DSS for subscripts.

Re: Subscript for time based variabel

Posted: Wed Oct 04, 2023 12:11 pm
by nidfar
yes, i have vensim pro.
but i ask about subscript feature for time based variabel. can subscript used for time based variable?

Re: Subscript for time based variabel

Posted: Fri Oct 06, 2023 2:12 pm
by tomfid
There's a subscripted project model in the User Guide:
https://www.vensim.com/documentation/21195.html

Re: Subscript for time based variabel

Posted: Fri Oct 06, 2023 2:50 pm
by tomfid
It's not really a comprehensive project model, but it does show how to set up the subscripting.

Unless you do some really arcane stuff, you won't really be doing CPM in Vensim (or any other SD tool). But that's kind of the point: CPM ignores the cross-stage rework cycle, partial concurrency, and other effects, which is why it's useful to move away from that view of things.