Search found 23 matches

by ESC
Fri Aug 08, 2008 11:19 am
Forum: Vensim
Topic: On screen simulation?
Replies: 2
Views: 2268

Thanks a lot - managed to get it to work eventually :)
by ESC
Wed Jul 30, 2008 2:26 pm
Forum: Vensim
Topic: On screen simulation?
Replies: 2
Views: 2268

On screen simulation?

For want of a better description, what I am looking for is whether Vensim in any shape or form supports a feature, where the simulation runs sufficiently slowly for the graphs to change / update in front of the viewer. I guess it would probably look like a gaming mode with no input changes and the p...
by ESC
Thu Oct 26, 2006 3:56 pm
Forum: Vensim
Topic: Unable to find error?
Replies: 5
Views: 3871

It is named % of something. The weird problem is that there are at least 10 variables in the same model named % something but Vensim does not like only this particular one. Will renaming help?
by ESC
Thu Oct 26, 2006 1:03 pm
Forum: Vensim
Topic: Unable to find error?
Replies: 5
Views: 3871

It is an actual error message with a white diagonal cross on a red background, with the only clicking option being OK, as opposed to ...the variables were not expected but are used...
by ESC
Thu Oct 26, 2006 11:10 am
Forum: Vensim
Topic: Unable to find error?
Replies: 5
Views: 3871

Unable to find error?

I have been faced with the problem at some point in the past. What happens is that the plumbing is drawn, the variables in, then it comes to equation entry time and problems occur. All the relevant variables for an equation are entered through linking with arrows. The equation is of the type A*B/C. ...
by ESC
Wed Oct 18, 2006 2:24 pm
Forum: Vensim
Topic: Output Workbench Graph - Scaling?
Replies: 1
Views: 2079

Output Workbench Graph - Scaling?

I was wondering if there was a way to rescale or predefine a scale for output workbench graphs, things like defining a lower and upper boundary of what is displayed, the size of the graph area as opposed to the white background...
by ESC
Wed Oct 18, 2006 12:07 pm
Forum: Vensim
Topic: Delay Conveyor Question
Replies: 3
Views: 2979

Thanks!

Unfortunately I may not post the model but could do a simplified version. I simply remodelled it (closely along the lines Bob described) to get rid of the problem for now :)
by ESC
Wed Oct 18, 2006 9:57 am
Forum: Vensim
Topic: Delay Conveyor Question
Replies: 3
Views: 2979

Delay Conveyor Question

I have had some trouble with a conveyor delay in a model. I know how to construct one with an inflow, an outflow (where the delay conveyor function nests) and a loss outflow. Here I have three separate outflows with respective delay conveyor functions and no loss outflow, since technically there are...
by ESC
Thu Jun 22, 2006 6:53 am
Forum: Vensim
Topic: Subscripts - GET XLS?
Replies: 3
Views: 2813

Thanks a lot!

So if I have 3 subscripts, let's say Age Group, Gender and Country, I simply put in the required number of tabs, so for 3 countries and 2 genders it would be 6 with then 6 equations?
by ESC
Wed Jun 21, 2006 10:17 am
Forum: Vensim
Topic: Subscripts - GET XLS?
Replies: 3
Views: 2813

Subscripts - GET XLS?

I am currently constructing a model, which reads in population data from an external source, as accurately modelling the population would be a lot of unnecessary work. One of the subscripts is Age Group, so when reading data in, I would have around 100 entries for each time period in the simulation,...
by ESC
Wed Jun 29, 2005 1:50 pm
Forum: Vensim
Topic: Subscript combination
Replies: 16
Views: 11059

Thanks a lot :)

Is it still possible to track which batch something came from say three stocks later into the model?
by ESC
Wed Jun 22, 2005 3:18 pm
Forum: Vensim
Topic: Subscript combination
Replies: 16
Views: 11059

That's it, absolutely :)

And raw material is not batch specific, although the raw material that is measured out is measured out for a specific batch - the batch is traced from when the raw material is brought in to when the finished product leaves the factory doors.

[Edited on 22-6-2005 by ESC]
by ESC
Wed Jun 22, 2005 10:55 am
Forum: Vensim
Topic: Subscript combination
Replies: 16
Views: 11059

A batch is simply a a tracing or description of a "production batch." The production goes in batches meaning they are the production size. As an example, if batch size is 50, only 50, no more, no less can be produced. So units 1-50 are batch 1, 51-100 are batch 2... They are important beca...
by ESC
Wed Jun 22, 2005 10:30 am
Forum: Vensim
Topic: Subscript combination
Replies: 16
Views: 11059

Model

Finally I got it to work, I reread your comment Mr. Lauble and remodelled the production is active part. No errors but the results are funny. It can produce both product types at once, which I understand, as I was not able to figure out an inteligent way to define the prerequisites to avoid it, whic...
by ESC
Wed Jun 22, 2005 9:34 am
Forum: Vensim
Topic: Subscript combination
Replies: 16
Views: 11059

Model

Restating the question, attached is a working model, which has everything but the part determining that only one batch may be produced at once. How do I add that part with two as opposed to one subscript, as in the user's guide?
by ESC
Wed Jun 22, 2005 9:05 am
Forum: Vensim
Topic: Subscript combination
Replies: 16
Views: 11059

Model

I did not put in any units, it's true, I thought of dealing with that later. As for the equation, if it's done according to the Vensim manual and with one subscript only, say only batch, it would still have to have the same structure, as the softeware needs to know prerequisites (of the 5 batches) f...
by ESC
Tue Jun 21, 2005 5:53 pm
Forum: Vensim
Topic: Subscript combination
Replies: 16
Views: 11059

Model

I just attached the model. I am not quite sure I understand your suggestion. From the sum by product type I would need to see which batches are in there as well. The model now gives me incorrect number of subscripts for pretty much every variable but I simply do not now how to resolve it (I did get ...
by ESC
Tue Jun 21, 2005 5:33 pm
Forum: Vensim
Topic: Subscript combination
Replies: 16
Views: 11059

Subscript combination

I am not quite sure how to call this problem but it goes something like this. I want to model a supply chain with a pull principle - if there is not enough of a given product somewhere some more needs to be produced. There are two subscripts, one is the product type, the second one is batch, namely ...
by ESC
Fri Feb 11, 2005 9:08 am
Forum: Vensim
Topic: Delay Conveyor
Replies: 8
Views: 6539

Actually it makes perfect sense. Thanks a lot :)
by ESC
Thu Feb 10, 2005 3:05 pm
Forum: Vensim
Topic: Delay Conveyor
Replies: 8
Views: 6539

I thought what is inside the stock is actually what is on the conveyor. The way it's designed are a stock, an inflow and the outflow. The outflow is a delay conveyor of the inflow, so I assumed the outflow to be the finished items and the stock to be what is on there. Lee, did I understand that corr...
by ESC
Thu Feb 10, 2005 12:13 pm
Forum: Welcome and General Information
Topic: Forum Suggestions
Replies: 7
Views: 13266

Emoticons

Are the emoticons really working? One can click at them and the code is diplayed just like in other Inet forums but when the message is posted it displays with the emoticon code instead of the emoticon itself :(
by ESC
Thu Feb 10, 2005 12:08 pm
Forum: Vensim
Topic: Delay Conveyor
Replies: 8
Views: 6539

Delay Conveyor

Thanks a lot, that's more or less settled then. One surprising finding though was that if I increase the leakage rate, the amount leaving the conveyor drops but the amount on it actually increases, keeping everything else constant. That strikes me as somewhat counterintuitive. :o [Edited on 10-2-200...
by ESC
Thu Feb 10, 2005 11:07 am
Forum: Vensim
Topic: Delay Conveyor
Replies: 8
Views: 6539

Delay Conveyor

Just a quick simple question: Is it possible, if one is using a delay conveyor function to somehow specify the following: - at time t take out a given amount of material (leak) from a given point in a conveyor. From what I read in the manual, the leakage rate is constant and it occurs all along the ...