Hi everyone

I have a question about the function of FIND ZERO
The model I tried to build calculates IRR based on current profits, to assess whether there is any appeal for investment. Vensim has an IRR function, but his results are more about showing the evolution of the results.
Therefore, I consider using the FIND ZERO function to calculate IRR under the premise of NPV=0.
But I have some doubts when I use the FIND ZERO function.
2.png
2.png (15.35 KiB) Viewed 1515 times
3.png
3.png (10.33 KiB) Viewed 1515 times
When I run the model, the system report error that FIND ZERO did not sufficiently zero. It is shown in figure of NPV
My understanding is that when FInd zero cannot find 0, we cannot calculate the IRR. But such a huge difference (the figure of NPV) does not affect the IRR result graph, so, I was wondering what's wrong with that?
In the above figure, the profit as a fixed value. I uploaded a simple model that how I calculate the IRR by FIND ZERO function, when I use random funtion to as the profit, a result of NPV has very large negative value. But from the profit of the input data, and the result of the calculated IRR does not reflect such a different difference.

Thank you very much for you attention.
simple.mdl
(4.2 KiB) Downloaded 172 times
tomfid
Administrator
Posts: 3804
Joined: Wed May 24, 2006 4:54 am

Re: A question about Find Zero Function

Post by tomfid »

I think the problem is that this is numerically cranky as formulated. Your NPV has a scale ~ investment, i.e. billions, while your x scale parameter is set to 1. Zeroing the npv to the nearest dollar is hard (and a waste of computation since the prospective NPV of a project is never certain).

Set x scale to 1e9 and tolerance to something like 100 and it works fine.

A more general approach might be to compute frac err = NPV/investment cost, and zero that in place of NPV. That way you can use parameters like x scale = 1 and tolerance = .0001, which seems more natural.
kong17
Senior Member
Posts: 60
Joined: Wed May 30, 2018 1:12 pm
Vensim version: PRO

Re: A question about Find Zero Function

Post by kong17 »

tomfid wrote: Tue Jun 23, 2020 2:36 pm I think the problem is that this is numerically cranky as formulated. Your NPV has a scale ~ investment, i.e. billions, while your x scale parameter is set to 1. Zeroing the npv to the nearest dollar is hard (and a waste of computation since the prospective NPV of a project is never certain).

Set x scale to 1e9 and tolerance to something like 100 and it works fine.

A more general approach might be to compute frac err = NPV/investment cost, and zero that in place of NPV. That way you can use parameters like x scale = 1 and tolerance = .0001, which seems more natural.
It works, thank you very much.