Find Zero function

Use this forum to post Vensim related questions.
Post Reply
kong17
Senior Member
Posts: 60
Joined: Wed May 30, 2018 1:12 pm
Vensim version: PRO

Find Zero function

Post by kong17 »

Dear

I try to build a model about electricity market. For the investment in the new power plant, I use the IRR calculated by the NPV to evaluate. Therefore, in each year, I need to calculate the IRR from the current annual income and points. So I used FIND ZERO function in vensim.
The problem now is that when the annual income is very low, there will be distortions through FIND ZERO, even when profits increase, this situation will continue.
Therefore, I simply expressed the model, and I was wondering how can this situation be avoided.
Thank you very much!

Best wishes
simple.mdl
(3.77 KiB) Downloaded 140 times
tomfid
Administrator
Posts: 3811
Joined: Wed May 24, 2006 4:54 am

Re: Find Zero function

Post by tomfid »

In 2019 and 2020, when profits crash, I think it's numerically impossible to zero the NPV. At that point, IRR gets stuck and what must be a local minimum, because future values don't move off of that point. If you change the "method" to 1, the computation at least recovers after the negative-profit episode.