I have a Vensim model with a time step of 5 minutes but I only want Sable to report on it ( calculate? ) at hourly intervals otherwise it runs too slowly.
How do I tell Sable to draw graphs or do animations at an interval greater than a time step?
Sable time step v's reporting time
Moderator: Administrator
-
- Super Administrator
- Posts: 4590
- Joined: Wed Mar 05, 2003 3:10 am
-
- Super Administrator
- Posts: 4590
- Joined: Wed Mar 05, 2003 3:10 am
Try changing the save period in Vensim (SAVEPER)
Go to menu>Model>settings and the "Time Bounds" tab
De-select "save results every time step" and choose a new interval at which to save results.
The model will still calculate at the "5 minute" time step but report results at the newly selected period, both in Vensim and Sable
Go to menu>Model>settings and the "Time Bounds" tab
De-select "save results every time step" and choose a new interval at which to save results.
The model will still calculate at the "5 minute" time step but report results at the newly selected period, both in Vensim and Sable