Graphs lines can not be seeing...

Use this forum to post Vensim related questions.
Post Reply
CLAUDIO
Member
Posts: 26
Joined: Tue Jun 13, 2006 4:37 pm

Graphs lines can not be seeing...

Post by CLAUDIO »

Dears

As I was doing previously I was using the control panel to set a basic graph to my model with the following scale:
In time axis:
Start time: 0
Special Time: 30
End Time: 30
Then I ran the model and clicked on graph button and the line is showed.

In order to display the range of years correctly, as I did it before, I have set the following:
Start time: 2000
Special Time: 2030
End Time: 2030
Then I ran the model and clicked on graph button but at this time the graph-line was not showed in the screen!

Afterward I started to set new graphs with several variables; however the strange problem still remained...
Basically when I have set the X-min and X-max as 0 and 30, the graph (lines) is shown but when the X-min and X-max was respectively settled as 2000 and 2030 with the X-divisions box empty or settled 30 the graph-line is not shown in the screen.

Somebody could give a clue what is happening, please?

Tks

Cláudio
CLAUDIO
Member
Posts: 26
Joined: Tue Jun 13, 2006 4:37 pm

Post by CLAUDIO »

I solved the problem simply setting the Time Bounds for the Model in Model Settings.
I think that is the answer.

Thanks anyway...

Cláudio

[Edited on 10-1-2008 by CLAUDIO]
Post Reply