Search found 4 matches
- Thu Sep 16, 2004 11:13 am
- Forum: Vensim
- Topic: Time Steps and If then else
- Replies: 5
- Views: 7382
Is there any way of having the change from type 1 to type 2 as a constant per month? When I put the units as dmsl/month (and change the units of conversion), I get the problem that not all the items convert from one type to the other at the specified time for different time steps. (Model adjusted an...
- Tue Sep 14, 2004 11:16 am
- Forum: Vensim
- Topic: Time Steps and If then else
- Replies: 5
- Views: 7382
- Tue Sep 14, 2004 10:46 am
- Forum: Vensim
- Topic: Time Steps and If then else
- Replies: 5
- Views: 7382
Time Steps and If then else
I'm using an 'if then else' statement to convert items of one type to another after a certain time. When I use different time steps, not all the items convert when the time hits 12 (works OK with 1, but not with 0.5 or 0.125). Can anybody explain why they don't convert or what I'm doing wrong - mode...
- Fri Aug 20, 2004 3:00 pm
- Forum: Vensim
- Topic: Resetting Levels
- Replies: 2
- Views: 4388
Resetting Levels
I'm building a model with timesteps in months. I want to look at the levels every year and then reset to zero at time = 12, 24 etc. (So I can see the accumulated costs at year end.)
Is there an easy way to do this?
Is there an easy way to do this?